STYSA Goal Inspection Criteria
Association: ____________________________________ Club: ______________________________
Location of the Fields:_________________________________________________________________
Inspector: _______________________________________ Title: ______________________________
Check the appropriate answer for each item listed below
YES NO
____ ____ a. Have all open hooks to which nets should be attached been removed?
____ ____ b. Are there rusted or weak places on any of the posts?
____ ____ c. Are there jagged or sharp points or edges on any of the posts?
d. For posts in the ground:
____ ____ (1) Are posts rusted and weakened at the ground or just below ground level?
____ ____ (2) By pressing against and shaking the posts, are they securely in the ground?
____ ____ (3) The posts appear to be approximately vertical and are not leaning significantly.
____ ____ (1) Is the goal built so that it DOES NOT tip easily when weight is applied to the top or
horizontal bar?
____ ____ (2) Is the goal built so that it DOES NOT tip or topple easily when the rear supporting part
of the goal is raised?
____ ____ (3) Is the construction of the goal such that unless staked, it will tip or topple easily?
Note: Please remember that a goal which requires staking to be stable is easily unstaked. Therefore, any such goal should be removed and dismantled.
____ ____ a. Is any connection deteriorated or weakened by rust or fatigue?
____ ____ b. Each connection will properly support the weight of the members it supports?
STYSA Goal Inspection Criteria
Page 2
____ ____ a. Are there rusted or weak places in the braces?
____ ____ b. Are there jagged or sharp points or edges on the braces?
____ ____ c. For supporting braces in the ground, are braces rusted and weakened at ground or just
below ground level?
For any goal found to be a problem, red tag or place a notice which is easily noticeable on the goal. Immediately notify, orally and in writing, the local association or any group responsible for the goal. Advise the association or group responsible of the specific problem observed and provide them with a deadline by which to make the necessary repairs. Reinspect after the deadline or the repair is done to insure that the repair has properly resolved the problem(s) observed.
________________________________________ _________________________
Signature of Inspector Date Inspected